This technical report discusses the technical aspects, research, legislation, standards activities, and operation of the two widely-used Variable Angle Tribometers (VATs) commercially available for testing of walkway surface slip resistance: The English XL and the Brungraber Mark II.
ViewThis standard establishes the elements and activities for pre-project and pre-task safety and health planning in construction.
ViewThe new risk management standards are expected to revolutionize best practices for safety, health and environmental professionals working in the risk management and insurance industry. Z690.1 Vocabulary for Risk Management, Z690.2 Risk Management Principles and Guidelines, Z690.3 Risk Assessment Techniques.
ViewThis standard provides guidance on including prevention through design concepts within an occupational safety and health management system.
ViewThis technical report discusses the technical aspects, research, legislation, standards activities, and operation of the two widely-used Variable Angle Tribometers (VATs) commercially available for testing of walkway surface slip resistance: The English XL and the Brungraber Mark II.
ViewThe scope of the standard addresses the establishment of safety requirements for the construction, operation, maintenance, and use of scaffolds used in the construction, alteration, demolition, and maintenance of buildings and structures.
ViewEstablishes safety requirements pertaining to concrete construction and masonry work in construction.
ViewProvides minimum safety requirements for the selection, installation, operation and maintenance of space heating devices and equipment of temporary and portable design
ViewEstablishes safety requirements for the selection, installation, and use of personnel and debris nets during construction, repair, and demolition operations.
ViewEstablishes standards for the prevention of deaths, injuries and damage during or related to excavation operations.
ViewThis standard establishes safety requirements for the erecting, handling, fitting, fastening, reinforcing and dismantling of structural steel, plate steel, steel joist, and metal deck at a final in-place field site during construction, maintenance and dismantling operations.
ViewThis standard establishes the elements and activities for pre-project and pre-task safety and health planning in construction.
With access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.