ISHN logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
ISHN logo
  • NEWS
    • Today's News
    • Global Safety News
    • Government Regulations
  • PRODUCTS
    • Product Innovations
    • Featured Products
  • TOPICS
    • Environmental Health and Safety
    • Facility Safety
    • Workplace Health
    • Occupational Safety
    • PPE
    • More Topics
  • CONSTRUCTION
  • TECHNOLOGY
  • COLUMNS
    • Best Practices
    • Dave Johnson: What’s going on
    • Editorial Comments
    • Leading Safety
  • MULTIMEDIA
    • ISHN Podcast
    • Videos
    • Cold Stress Education Quiz
    • Webinars
    • White Papers
  • MORE
    • Buyer's Guide
    • Newsletters
    • Convention Companion
    • Polls
    • Events
    • ISHN Store
    • Sponsor Insights
  • EMAGAZINE
    • eMagazine
    • Archived Issues
    • Contact
    • Advertise
  • JOIN TODAY!

Preparing for VPP

By Diane Gerhart, CSP
October 1, 2007


Considering and completing the application process to the OSHA Voluntary Protection Program can be daunting. The application itself can seem lengthy and confusing, not to mention the big change in mindset required: Many safety professionals spend their days working to keep OSHA out of their facilities, and now must entertain the idea of inviting them in. Luckily, once a company has the line and management commitment to pursue VPP, there are a number of resources available to help, not least of which is the experience of companies who have been there, done that.

Following are some strategies that helped one company achieve OSHA VPP Star status.

Note that a number of states have their own OSHA-approved state safety and health plans. These states may have VPP-type cooperative programs that differ from federal OSHA VPP. Although many of the following concepts can be applied to either type of plan, the website references included to below are federal OSHA.

1) Assess your readiness
A great first stop for those considering VPP is the OSHA website, www.osha.gov. The VPP section contains a number of useful reference documents and templates. We used their Self-Assessment Checklist to assess readiness for application, which includes making sure historical incident rates meet established criteria. The checklist also describes the “Four Basic Elements” that are evaluated when a company applies to participate in VPP:

• Management Leadership and Employee Involvement
• Worksite Analysis
• Hazard Prevention and Control
• Safety and Health Training

If incident rates are acceptable, and employees are comfortable with the “four basics,” it’s time to begin the application process. The application template can also be found in the VPP section of OSHA’s website.

2) Your written evaluation
In addition to completing the VPP application, we conducted a written evaluation of the site safety program using the OSHA Annual Safety and Health Self-Evaluation template as a guide. OSHA requires VPP sites to submit a self-evaluation of their safety program annually, and this is the format that is recommended for the submission.

We were required to have two years of annual self-evaluations completed before our application would be considered, so this was a time-influencing factor. But because the annual evaluation does not necessarily have to be in the OSHA-recommended format for pre-inspection sites, an annual evaluation that has previously been completed may be an acceptable substitute. Note, however, that physical worksite inspection checklists alone are typically not adequate, as the OSHA annual evaluation calls for narrative program assessments, as well as goal- and objective- setting for improvement, and documented follow-up.

3) Your onsite review
Once an application is reviewed and accepted by OSHA, an onsite review will be scheduled. Over several days, a small team of auditors will glean information via three methods: observation, documentation, and interview.

Observation: Site compliance with OSHA regulations will be observed through physical inspection. One of the questions OSHA will answer is, “Did the VPP team find hazards that should have been found through self-inspection?” So it’s important to perform a thorough physical inspection of the facility prior to the onsite team’s arrival. It’s also a good idea to review past self-audits and safety meeting minutes to make sure that all noted hazards have been cleared. And of course, a clean facility always makes a good first impression.

Documentation: We found documentation to be a key component of VPP participation — daily walkthroughs, inspections, meeting minutes — anything that was not documented or observable was suspect of actually having occurred. We made sure our filing system was well-organized so that we could easily locate any documents that the onsite team requested, and prepared a three-ring binder of documents that the onsite review team would likely be asking to see.

Interviews: The thought of sitting down one-on-one with an OSHA inspector and answering questions can be intimidating for employees. They might worry that a wrong answer from them will jeopardize the entire VPP endeavor or get them in hot water with their boss. A list of recommended interview questions can be found on the OSHA website, and we found it helpful to review these with employees. We asked employees not to worry about giving the “right” answer, or saying what they think OSHA would want to hear, but instead to simply answer honestly. We also let them know that it was acceptable to say they didn’t know the answer if asked a question outside their area of knowledge.

4) Orientations
As we prepared for the onsite review, we developed two orientation programs, one for our employees and one for the OSHA onsite review team.

For employees: OSHA’s website provides a resource entitled, “What happens when the VPP Team comes onsite?” We reviewed this document with employees so everyone would know what to expect.

For OSHA: We worked with both line and management employees to create an orientation presentation for the onsite review team. The presentation included information such as:

• Alarm descriptions, evacuation routes, and muster points;
• Review of personal protective equipment requirements;
• A site organizational chart to introduce the facility’s team;
• An overview of our manufacturing process and plant layout;
• Our commonly-used chemicals and their hazards;
• Intellectual property protections, such as photography restrictions.

5) Mental preparation
Stay cool. It’s not so much about the climate, it’s the attitude.

After all of the hard work involved in preparation for the onsite inspection, it can be difficult hear criticism, no matter how constructive or minor.

As an example, we had neglected to label a sampling port on a tank as “Confined Space-No Entry,” thinking it was too small of an opening to require marking. OSHA pointed this out to us, noting that while it was not a large enough opening for bodily entry, an employee could stick his head inside. One of our employees remarked, “Well maybe we should label the toilet, because I could stick my head in there, too.”

Everyone had a good laugh and the frustration level that had been building was diffused with humor. A missing label or sign can seem like an insignificant point, but it’s also a very easy fix. Prepare your employees for the inevitability that corrective actions will be recommended during the onsite inspection, and that this is expected and acceptable.

6) Use other resources
Regional Voluntary Protection Program Participants’ Associations (VPPPAs) are a valuable resource. They offer mentoring opportunities and periodic application workshops where companies considering applying to VPP can get tips on completing the application, see examples of completed applications, and network with employees from area VPP sites.

OSHA’s website also provides a link to find a site’s local VPP coordinator. This liaison can provide information such as how long the application review process might take and if there is any backlog in scheduling onsite reviews.

One final note: We took the “Employee Involvement” aspect of the Four Basic Elements very seriously and decided that each site’s participation in VPP should be an employee-driven endeavor. Although our safety and management leadership encouraged involvement with VPP, the ultimate decision to pursue Star status was left to each facility’s team, and we believe that this commitment was critical to their success.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Diane Gerhart is a Certified Safety Professional holding a BS in Mechanical Engineering and an MS in Safety Sciences. She has mentored two manufacturing plants to VPP Star status and currently works as an independent safety consultant. She can be reached at dm_gerhart@yahoo.com.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • forklift safety

    Exploring the latest technologies in forklift safety

    With more staff and more stock in warehousing now more...
    Facility Safety
    By: Josh Cramer
  • welding

    All about welder’s flash or arc eye

    A flash burn is a painful inflammation of the cornea,...
    Environmental Health and Safety
  • dangerous jobs

    The 10 most dangerous jobs in the U.S.

    On-the-job deaths have been rising — hitting the highest...
    Occupational Safety
    By: Benita Mehta
Manage My Account
  • eMagazine Subscriptions
  • ISHN Newsletter & Other Newsletter Alerts
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the ISHN audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of ISHN or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • man wearing the the Sundström SR200 Full Face Mask Respirator
    Sponsored byOHD

    5 Fit Testing Mistakes That Could Cost You

  • This image shows Magid AcuSpex polarized blue mirrored safety glasses.
    Sponsored byMagid Glove and Safety

    Construction PPE Guide: What Crews Need for Each Task

  • lone worker in confined space
    Sponsored byAlphasense Ltd.

    GET THE LEAD OUT of your Safety Oxygen Sensors!

Popular Stories

SpaceX 7 launch

OSHA Investigating Fatal Fall at SpaceX Starbase

Worker Impairment

How to Tell When a Co-Worker is Impaired? A Safety Pro’s Challenge

psychology in the workplace

Most Workplaces Measure Psychological Safety, Ignoring Psychosocial Risks

top 10 most dangerous jobs

Poll

Seasonal Readiness

With the federal heat stress prevention rule on the horizon, which area of your safety program needs the most attention?
View Results Poll Archive

Products

Surviving an OSHA Audit A Management Guide, 2nd Edition

Surviving an OSHA Audit A Management Guide, 2nd Edition

See More Products

ISHN Podcasts

Related Articles

  • OSHA vows support for VPP

    See More
  • ASSE president urges OSHA to enlist help of safety pros for VPP oversight (6/23)

    See More
  • ClickSafety unveils newly revised advanced safety course for leaders preparing for STS Construction Exam

    See More

Related Products

See More Products
  • 0470387408.jpg

    Preparing for OSHA s Voluntary Protection Programs: A Guide to Success

See More Products

Events

View AllSubmit An Event
  • May 19, 2016

    IndustrySafe and VPP Compliance Webinar

    In this free webinar, you will learn how IndustrySafe Safety Software can assist you in achieving Voluntary Protection Program (VPP) Compliance and how IndustrySafe can assist with achieving VPP Star and Merit Status.
  • October 18, 2017

    ACGIH® TLV® For Audible Sound – Understanding the Proposed Notice of Intended Change to The Acgih® Tlv® for Noise

    Occupational noise exposures represent an important but under-recognized cause of disease and disability in the United States. Now titled as Audible Sound, the ACGIH® Threshold Limit Values for Physical Agents (TLV®-PA) Committee has proposed a revision to the TLV® for Noise.
View AllSubmit An Event
×

Become a Leader in Safety Culture

Build your knowledge with ISHN, covering key safety, health and industrial hygiene news, products, and trends.

JOIN TODAY
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Manufacturing Division
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing