Today's News

Chemical Safeety Board: Revise codes to require safe distances between buildings and hazmat areas (7/22)

A U.S. Chemical Safety Board (CSB) case study released yesterday on the 2009 explosion and fire at the Veolia ES Technical Solutions L.L.C. facility in West Carrollton, Ohio, calls on the industry to improve safety standards covering hazardous waste processing, handling, and storage facilities. The Board also recommended that fire protection codes be revised to require companies to determine safe distances between occupied buildings and potentially hazardous operating areas.

The accident occurred on May 4, 2009, when flammable vapor was released from a waste recycling process, ignited, and violently exploded. The blast seriously injured two workers and damaged 20 nearby residences and five businesses. CSB investigators found that the north wall of the lab and operations building – where the victims were injured – was less than 30 feet from the waste recycling processing area where the flammable vapor was released.

CSB Chairman Rafael Moure-Eraso said, “This accident should not have happened. Our report notes that OSHA cited the company for inadequate attention to process safety management practices in the handling of flammable liquids. But in case of an accident, I believe it is absolutely critical that buildings at chemical facilities be sited safe distances from process equipment to maximize the safety of workers. We are making recommendations that would help ensure that operating areas with occupied buildings such as control rooms be sufficiently separated from process areas containing flammable liquids and gases that have the potential to explode.”

CSB lead investigator Johnnie Banks said, “At the time of the shutdown, witnesses reported hearing the sound of a sudden, loud vapor release and smelling a very strong odor of THF solvent which knocked several employees to their knees. It was a matter of just a couple of minutes until the highly flammable vapor ignited.”

The vapor drifted to the laboratory and operations building and found an ignition source inside the building. A worker in the control room reported being enveloped in a fireball that went through the building. The first explosion knocked over a bank of lockers, severely injuring an employee and pinning him underneath.
You must register or login in order to post comments.

Multimedia

Videos

Image Galleries

ISHN's Favorite Cover Images

Take a look at some of our favorite cover images!

THE MAGAZINE

ISHN Magazine

2012 February

ISHN's latest edition is available now. Check it out!

TABLE OF CONTENTS SUBSCRIBE

THE ISHN STORE

ISHN White Paper 2011
Our 28th annual White Paper Survey: State of the EHS Nation. Benchmark your program against the EHS nation!

More Products

Clear Seas Research

Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Webinars

ISHN Webinars are an easy, effective and convenient way to get educated and informed on the latest industry trends and topics. All Webinars are FREE unless indicated. For more information, check out our Events page!

STAY CONNECTED

Facebook logo logo

!-- START OF SmartSource Data Collector TAG -->