Today's News

MSHA approves first wireless tracking system (2/7)

The Mine Safety and Health Administration (MSHA) has issued its first official approval of a wireless tracking system for use in underground mines. The approval was issued by MSHA's Approval and Certification Center to Venture Design Services Inc. for the MineTracer Miner Location Monitoring System.

"Since the Sago Mine disaster, MSHA has received dozens of proposals from manufacturers and distributors of emergency communication and tracking systems," said Richard E. Stickler, acting assistant secretary of labor for mine safety and health. "This approved system provides a wireless means for mine operators to track miners underground both before and after an emergency event."

The system components normally will be interconnected with low-voltage DC power cables. However, in the event of an emergency, the power cables become de-energized, and the system will resort to battery power and can remain operational wirelessly. Although not yet incorporated in the design, Venture Design intends to add text messaging and gas detection to the system in the future.

Since 2006, MSHA has issued 36 new or revised approvals for communications and tracking systems, including a hand-held portable radio, several leaky feeder systems and several radio frequency identification (RFID) tracking system components. MSHA currently is examining 41 additional communications and tracking approval applications, including several wireless communications and tracking systems.

The Mine Improvement and New Emergency Response (MINER) Act of 2006 requires that each mine evacuation plan include provisions for tracking the pre-accident location of all underground miners. Furthermore, the MINER Act requires that mine operators adopt wireless communications and electronic tracking systems by June 2009.

Did you enjoy this article? Click here to subscribe to ISHN.

You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

ISHN's Favorite Cover Images

Take a look at some of our favorite cover images!

THE MAGAZINE

ISHN Magazine

May 2013 ISHN cover

2013 May

The cover story of ISHN's May issue is about how lower exposure limits lead to conservative sensor settings. Also, check out some tips on how to avoid heat stress and advice on how to improve hand hygiene.

Table Of Contents Subscribe

THE ISHN STORE

ANSI/ASSE A10.1-2011 Pre-Project & Pre-Task Safety and Health Planning

This standard establishes the elements and activities for pre-project and pre-task safety and health planning in construction.

More Products

Clear Seas Research

Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

ISHN Webinars are an easy, effective and convenient way to get educated and informed on the latest industry trends and topics. All Webinars are FREE unless indicated. For more information, check out our Events page!

STAY CONNECTED

Facebook logo Twitter YouTubeLinkedIn