ISHN logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
ISHN logo
  • NEWS
    • Today's News
    • Global Safety News
    • Government Regulations
  • PRODUCTS
    • Product Innovations
    • Featured Products
  • TOPICS
    • Environmental Health and Safety
    • Facility Safety
    • Workplace Health
    • Occupational Safety
    • PPE
    • More Topics
  • CONSTRUCTION
  • TECHNOLOGY
  • COLUMNS
    • Best Practices
    • Dave Johnson: What’s going on
    • Editorial Comments
    • Leading Safety
  • MULTIMEDIA
    • ISHN Podcast
    • Videos
    • Cold Stress Education Quiz
    • Webinars
    • White Papers
  • MORE
    • Buyer's Guide
    • Newsletters
    • Convention Companion
    • Polls
    • Events
    • ISHN Store
    • Sponsor Insights
  • EMAGAZINE
    • eMagazine
    • Archived Issues
    • Contact
    • Advertise
  • JOIN TODAY!
Today's Safety NewsOccupational SafetyTransportation Safety

Two train engineers injured, tested for drugs and alcohol in collision

October 11, 2019

A collision earlier this year involving two trains owned by the same company resulted in minor injuries to both engineers and the derailment of one locomotive and more than two dozen railcars.

The National Transportation Safety Board’s (NTSB) preliminary report into the incident reveals that a westbound CSX Transportation (CSX) freight train collided with an eastbound CSX freight train near Carey, Ohio at 5:08 a.m. on August. 12.

Garbage and fracking sand

The lead locomotive of one train and four railcars carrying trash were derailed on their side. Twenty-one railcars loaded with fracking sand derailed from the second train. Initial accident damage was estimated at $4.9 million.

Both train engineers were taken to a hospital for treatment of minor injuries and postaccident drug and alcohol testing.

Positive train control (PTC) – a system designed to prevent train-to-train collisions – had been disabled on the eastbound train after a system failure occurred previously while the train was en route to Garrett, Indiana.

The crew involved in the accident notified the CSX dispatcher of the disabled PTC system prior to departing Garrett and were given permission to proceed to Columbus where the system could be repaired.

According to the report:

CSX train movements on the Columbus Subdivision are governed by operating rules, timetable instructions, wayside signal indications, and enforced with a positive train control (PTC) system. The CSX dispatcher for the Columbus Subdivision, located in Jacksonville, Florida, coordinated train movements using the signal system. The subdivision was single main track territory with portions of multiple main track territory and passing sidings. The maximum authorized speed in the vicinity of the accident location was 50 mph. The westbound train tonnage required a speed restriction of 40 mph.

During postaccident interviews, the crew of the eastbound train said the wayside signals indicated as they approached control point (CP) Springs that the train would be diverged from the single main track onto main track 2. They stated they saw the westbound train approaching.

No response to flashing headlights

CP Springs on main track 1 and noted the locomotive headlight was on bright. The eastbound train engineer said that he flashed his headlight to indicate to the westbound train engineer to dim the locomotive headlight but received no response.

The PTC system was activated prior to departure. The crew’s first job assignment was to set out 30 empty cars in Carey. CSX instructions specify that for trains operating with active PTC, crews performing pickups, set offs, or other switching activities including shoving movements must: (1) Stop the train/locomotive; (2) Use restricted mode for the PTC system. In restricted mode, the PTC system allows train movement at restricted speed and no longer automatically stops the train before it can violate a red (stop) signal.

Train H70211 was still almost 2 miles long after the 30 empty cars were set out. The conductor, working at the rear of the train, planned to ride a railroad shuttle van to a nearby highway-rail grade crossing to board the lead locomotive and continue westbound to their next job assignment in Fostoria, Ohio. The engineer of train H70211 departed with the PTC system still in restricted mode and continued westbound for about 2 miles to CP Springs. Preliminary event recorder data indicated the train speed never exceeded 20 mph (upper limit threshold of CSX restricted speed rule). The train continued past the red signal at CP Springs and collided with the sixth railcar of the eastbound train W31411.

The NTSB investigation is ongoing. Investigative activities will focus on train crew distractions, crew resource management, and current railroad operating rules for PTC. Parties to the investigation include the Federal Railroad Administration; CSX Railroad; Brotherhood of Locomotive Engineers and Trainmen; Brotherhood of Railroad Signalmen; and International Association of Sheet Metal, Air, Rail, and Transportation Workers-Transportation Division.

The report did not contain a probably cause determination.

KEYWORDS: accident investigation injuries railroad industry safety

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • forklift safety

    Exploring the latest technologies in forklift safety

    With more staff and more stock in warehousing now more...
    Workplace Training Strategies
    By: Josh Cramer
  • welding

    All about welder’s flash or arc eye

    A flash burn is a painful inflammation of the cornea,...
    Environmental Health and Safety
  • dangerous jobs

    The 10 most dangerous jobs in the U.S.

    On-the-job deaths have been rising — hitting the highest...
    Transportation Safety
    By: Benita Mehta
Manage My Account
  • eMagazine Subscriptions
  • ISHN Newsletter & Other Newsletter Alerts
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the ISHN audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of ISHN or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • man wearing the the Sundström SR200 Full Face Mask Respirator
    Sponsored byOHD

    5 Fit Testing Mistakes That Could Cost You

  • This image shows Magid AcuSpex polarized blue mirrored safety glasses.
    Sponsored byMagid Glove and Safety

    Construction PPE Guide: What Crews Need for Each Task

  • lone worker in confined space
    Sponsored byAlphasense Ltd.

    GET THE LEAD OUT of your Safety Oxygen Sensors!

Popular Stories

SpaceX 7 launch

OSHA Investigating Fatal Fall at SpaceX Starbase

dust explosion

Tennessee OSHA Issues Record $3.1M Fine After Deadly Explosion at Munitions Plant

roofing dangerous jobs Getty.jpg

OSHA Finds Florida Roofing Company Willfully Exposed Workers to Safety Hazards After Worker’s Fatal Fall

top 10 most dangerous jobs

Poll

Seasonal Readiness

With the federal heat stress prevention rule on the horizon, which area of your safety program needs the most attention?
View Results Poll Archive

Products

Surviving an OSHA Audit A Management Guide, 2nd Edition

Surviving an OSHA Audit A Management Guide, 2nd Edition

See More Products

ISHN Podcasts

Related Articles

  • Bus company used drivers who tested positive for illegal drugs

    See More
  • Two workers killed in Iowa train collision (4/18)

    See More
  • Cause of two train crashes identical – and preventable

    See More

Related Products

See More Products
  • 1118959450.jpg

    Safety and Health for Engineers, 3rd Edition

See More Products

Events

View AllSubmit An Event
  • March 4, 2015

    ACGIH® TLV® for Heat Stress and Strain in the Context of Heat Stress Management webinar

    While the Heat Stress and Strain TLV® is designed for exposure assessment, it exists in the context of an integrated heat stress management program. This webinar will outline the components of a heat stress management program to illustrate how the TLV® can be used for exposure assessment and the development of controls.
View AllSubmit An Event

Related Directories

  • Jant Pharmacal Corp.

    Since 1986, Jant Pharmacal has supplied healthcare and workplace settings with rapid and lab-based tests. Jant Pharmacal’s workplace focus emphasizes on-site drug and alcohol tests to help reduce accidents, increase productivity and provide a safe environment. We have also been a leader in providing easy-to-use and accurate COVID-19 tests, including EUA antigen self-tests.
×

Become a Leader in Safety Culture

Build your knowledge with ISHN, covering key safety, health and industrial hygiene news, products, and trends.

JOIN TODAY
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Manufacturing Division
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing